Ground source heatpump installation for Heacol Consultants.
- Jan 28
- 1 min read
Updated: Mar 3

We carried out a 24 kw CTC ground source installation with a 600litre Hot water cylinder at a barn conversion near Skipton. The property had underfloor heating on the ground floor and first floor specified by Heacol. The system runs at 35 flow temp with delta T 5. provides ample hot water and is set up to do passive cooling using a heat exchanger and the bore holes.
Comments