top of page
Search

Our first Grant r290 installation.

  • dgjones1970
  • Aug 25
  • 1 min read

Last week we completed our first Grant R290 heatpump install and it’s a beauty. A stunning looking unit with nice square edges in black. Primary pro external lagging and through walls, 35mm primaries all lagged in Kingspan Kooltherm and two 200L plate loaded DHW Cylinders on a specially constructed base to spread the weight load. We’ve up graded 11 radiators and installed the new FRV flow setting valve from Sune Nightingales Firepower Company.

The customer is very happy with the install and we continue to work with him monitoring and tweaking the system until we get optimum performance.


ree

 
 
 
  • Facebook
  • Instagram
  • LinkedIn

Let's Discuss Your Next Project

Fill out the form, on the right of page or call us to set up a free in-home consultation.

 

Service Areas:

Based in Burrow, Kirkby Lonsdale, Cornforth and covers a  wide area

Rest Harrow, Woodman Ln,

Burrow LA6 2RL

 

t: 07572 150474 / 01524 928839

email: info@enrenewables.co.uk

https://www.enrenewables.co.uk/

Fully Certified

https://www.enrenewables.co.uk/
https://www.enrenewables.co.uk/
https://www.enrenewables.co.uk/

© 2035 by Synergy Solutions  www.synergygolfsolutions.com

bottom of page