top of page
Search

Underfloor mania

  • dgjones1970
  • May 2
  • 1 min read

We had 1km of underfloor heating overlay boards and pipe to get done this week in 2 days. It was a bit of a push but we managed.


Ryan and Luke put two long days in and

got everything pressure tested and ready for screeding on Tuesday.

 
 
 

Recent Posts

See All
Another Grant R290 retrofit

We’ve nearly completed another install this week. A 9kw grant r290 heatpump with a 200L urs supercoil heatpump cylinder. Update 6 radiators. These units are great bit of kit. Look beautiful and perfor

 
 
 

Comments


Let's Discuss Your Next Project

Fill out the form, on the right of page or call us to set up a free in-home consultation.

 

Service Areas:

Based in Burrow, Kirkby Lonsdale, Cornforth and covers a  wide area

Rest Harrow, Woodman Ln,

Burrow LA6 2RL

 

t: 07572 150474 / 01524 928839

email: info@enrenewables.co.uk

Fully Certified

https://www.enrenewables.co.uk/
https://www.enrenewables.co.uk/
https://www.enrenewables.co.uk/

© 2035 by Synergy Solutions  www.synergygolfsolutions.com

bottom of page